To upgrade the clients, follow these steps:
- On the Status page, select the endpoints you want to upgrade the clients.
- The client action bar is enabled above the table. In the Client Actions list, select Upgrade Clients.
- Click Submit. The action will be initiated on the client as per the set polling interval.
The client will be upgraded with the latest version.
Note: For Mac and Linux client, it is necessary to uninstall the existing client and perform a fresh installation using the latest packager.
Windows Upgrade (v10.9.0.0 or v10.12.0)
Upgrade flow depends on VDB date:
Admin sets reboot deadline (0–7 days):
After upgrade:
o AV status becomes Success
o Client version updates to v10.13.0.0
• Reboot is required
• If Universal Agent is installed, it integrates post-upgrade
Linux Upgrade (v10.9.0.0, v10.11.0.0, v10.12.0.0)
• VDB date must be on or after 21 Feb 2025
• Admin sends upgrade notification
• AV status changes to Upgrade in Progress
• Final version updates to v10.13.0.0
• Universal Agent integrates if installed
Linux upgrade will not have the Consent Based